• Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
No Result
View All Result
  • Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
No Result
View All Result
Blog - Creative Collaboration
No Result
View All Result
Home Cars

Renesas says fire-damaged chip line won’t restart for at least a month

March 22, 2021
Share on FacebookShare on Twitter

TOKYO — Renesas Electronics , a key automotive semiconductor supplier, said on Sunday that production at a fire-damaged plant will take at least a month to restart, potentially worsening a chip shortage that is disrupting light-vehicle output worldwide.

About two-thirds of production on the advanced 300 mm wafer line affected by Friday’s fire is automotive chips, CEO Hidetoshi Shibata said during an online briefing.

“It comes at a time when there isn’t excess production capacity,” he said.

Carmakers are already struggling with a global chip shortage caused by a COVID-19-driven boom in consumer electronics and an unexpected strong rebound in auto sales. General Motors, Ford Motor Co., Honda Motor Co. and Nissan Motor Co. have had to trim production plans as a result.

Automakers will start to feel a supply pinch in about a month, according to Renesas.

The chipmaker, along with automakers and their key suppliers, are looking for ways to minimize the impact of the fire, Shibata said.

A Toyota Motor Corp. spokeswoman said the world’s largest automaker is assessing the situation.

The fire at the Naka chip plant in northeast Japan destroyed 11 machines, or 2 percent of the manufacturing equipment, and sent smoke billowing through the clean room where even small particles of dust can damage wafers during the sensitive fabrication process.

Renesas may not be able to replace all the destroyed equipment within a month, Shibata said, meaning that a return to full production could take longer.

The company, he added, may be able to rely on other plants to replace around two-thirds of the lost production, which is worth around 17 billion yen ($156 million) a month.

The latest disruption at the Naka plants comes after production stopped for a few days last month after an earthquake cut power and back up generators failed to start.

In 2011, Renesas had to close the facility for three months following the deadly earthquake that devastated Japan’s northeast coast.

Next Post

WWE Fastlane 2021 Live Match Results And Updates

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • How GoHighLevel is simplifying agency software stacks
  • You’re probably ignoring Samsung’s best app — and it just got better
  • Oscars 2026: Watch Michael B. Jordan’s passionate acceptance speech
  • WhiteBridge AI raises $3M seed round
  • Rotwood Review | N4G

Recent Comments

    No Result
    View All Result

    Categories

    • Android
    • Cars
    • Gadgets
    • Gaming
    • Internet
    • Mobile
    • Sci-Fi
    • Home
    • Shop
    • Privacy Policy
    • Terms and Conditions

    © CC Startup, Powered by Creative Collaboration. © 2020 Creative Collaboration, LLC. All Rights Reserved.

    No Result
    View All Result
    • Home
    • Blog
    • Android
    • Cars
    • Gadgets
    • Gaming
    • Internet
    • Mobile
    • Sci-Fi

    © CC Startup, Powered by Creative Collaboration. © 2020 Creative Collaboration, LLC. All Rights Reserved.

    Get more stuff like this
    in your inbox

    Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

    Thank you for subscribing.

    Something went wrong.

    We respect your privacy and take protecting it seriously