• Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
No Result
View All Result
  • Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
No Result
View All Result
Blog - Creative Collaboration
No Result
View All Result
Home Mobile

NASA rocket test encounters problems ahead of first US lunar launch since Apollo

April 4, 2022
Share on FacebookShare on Twitter

First, thunderstorms delayed the dress rehearsal for NASA’s megarocket over the weekend, the final crucial step before launching it to the moon.

Then, lightning “struck twice” for the simulation test — figuratively speaking.

Mission operators said they needed to stop mid-rehearsal on Sunday to sort out a problem in the mobile tower that supports the rocket, known as the Space Launch System, on the ground. A fan that keeps hazardous gases out of the launcher wasn’t working. When it failed, technicians tried to use a backup fan to proceed, only to discover that it wasn’t working either. Each one was having a different issue, officials said.

The fans are intended to prevent gases that could cause a fire from entering the launchpad during the fueling process, said Charlie Blackwell-Thompson, launch director at Kennedy Space Center in Cape Canaveral, Fla. This is called “positive pressurization.”

Without the fan system, the NASA team didn’t believe it was safe to put the propellant into the rocket.

“We decided that we wanted to really understand that, given it was the first time loading the vehicle, and we made the decision to stand down to get in a configuration to go troubleshoot that and then be ready to make another run at it,” she said during a briefing with reporters on Sunday.

SEE ALSO:

NASA unveils its colossal moon rocket in grand display

By Monday, it appeared the space agency had resolved the fan issue and was prepared to continue the dress rehearsal.

Tweet may have been deleted

NASA is readying the 32-story, 5.75 million-pound rocket for a mission to the moon, known as Artemis I. It’s the first in a series of deep space exploration voyages that could blast off as early as May. The upcoming launch won’t include astronauts, but the monthlong flight will allow the United States to send a crew on the next, more complex mission, Artemis II.

The rocket is thought to be the most expensive ever built with each launch estimated to cost over $4 billion.

It’s been a long time since NASA had a rocket of this magnitude, capable of sending large payloads — astronauts and cargo — into deep space. Not only is the Space Launch System, or SLS, built to travel to the moon, it’s expected to one day put millions of miles on the odometer during the first crewed flight to Mars. Robotic scientific journeys to Saturn and Jupiter also could be in its future.

At its Florida launchpad, the fully assembled rocket, capped with the Orion spacecraft, is undergoing a two-day demonstration that involves filling the rocket with liquid fuel, practicing a countdown that stops right before ignition, and draining the tanks.


Credit: NASA/Ben Smegelsky

The four main engines, fueled with 700,000 gallons of super-cold fuel, will produce a thrust powerful enough to keep eight Boeing 747s aloft. Filling the humongous tanks will take about eight hours.

Only after successfully completing this so-called “wet dress rehearsal” will NASA set a date for the first lunar mission, agency leaders have said. Officials have said Artemis could lift off as early as May, though it’s more likely it will happen this summer, given the tight schedule.

As of Sunday evening, NASA didn’t believe the storms and lightning in the vicinity of the launch pad had anything to do with the fans malfunctioning. Mission representatives said the system ran normally during the foul weather.

When NASA said it was “go” for tanking fuel, it wasn’t immediately clear to the public how the agency addressed the fan problem overnight.

Tweet may have been deleted

Mike Sarafin, Artemis mission manager, told reporters on Sunday the events surrounding the rocket rehearsal, including four lightning strikes inside the launch pad perimeter the day before, have been unusual.

“It has been one of the more interesting 48 hours that I’ve had in the context of working missions leading up to a launch, and, in this case, leading up to a key test,” he said.

Next Post

Tyler, the Creator accepts his Grammy on Instagram Live

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • John Oliver takes a deep dive into Trump’s many pardons
  • AMD’s Radeon RX 9070 GRE has strong 1440p claims, but $549 may be a hard sell
  • Best fitness tracker deal: Save $50 on the Garmin Forerunner 165
  • I asked Gemini to summarize my digital life, and it accidentally created a beautiful year in review
  • Nvidia looks beyond China’s Unitree for its humanoid robot push

Recent Comments

    No Result
    View All Result

    Categories

    • Android
    • Cars
    • Gadgets
    • Gaming
    • Internet
    • Mobile
    • Sci-Fi
    • Home
    • Shop
    • Privacy Policy
    • Terms and Conditions

    © CC Startup, Powered by Creative Collaboration. © 2020 Creative Collaboration, LLC. All Rights Reserved.

    No Result
    View All Result
    • Home
    • Blog
    • Android
    • Cars
    • Gadgets
    • Gaming
    • Internet
    • Mobile
    • Sci-Fi

    © CC Startup, Powered by Creative Collaboration. © 2020 Creative Collaboration, LLC. All Rights Reserved.

    Get more stuff like this
    in your inbox

    Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

    Thank you for subscribing.

    Something went wrong.

    We respect your privacy and take protecting it seriously