• Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
Tech News, Magazine & Review WordPress Theme 2017
  • Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
No Result
View All Result
  • Home
  • Blog
  • Android
  • Cars
  • Gadgets
  • Gaming
  • Internet
  • Mobile
  • Sci-Fi
No Result
View All Result
Blog - Creative Collaboration
No Result
View All Result
Home Mobile

NASA video of moon rocket test shows something just went seriously wrong

June 28, 2025
Share on FacebookShare on Twitter

A test of a new rocket motor for NASA’s future moon missions went awry this week, with the full-size booster hurling a powerful blaze and scattering debris.

Northrop Grumman, lead contractor for the booster, conducted the two-minute ground test of the solid rocket motor, which was strapped down sideways. For the first 1.5 minutes, the motor — known as NASA’s Booster Obsolescence and Life Extension, or BOLE — seemed to be working fine. Seconds later, debris blew out of the nozzle and flames rippled through the long exhaust plume. 

The 156-foot booster kept firing through the remainder of the test, and no one was hurt. NASA’s livestream, which you can watch below, caught the incident, starting at about 22 minutes and 17 seconds into the video. 

Engineers didn’t immediately acknowledge the issue during that broadcast, apart from one controller uttering “Whoa,” followed by an audible gasp. The company later confirmed a problem occurred late in the burn, though representatives didn’t elaborate on what went wrong. 

The anomaly, which took place at a Northrop Grumman test facility in Promontory, Utah, raises questions about the hardware that could one day send astronauts into space — and potentially to Mars.

“As a new design, and the largest segmented solid rocket booster ever built, this test provides us with valuable data to iterate our design for future developments,” said Jim Kalberer, Northrop Grumman’s vice president of propulsion systems, in a statement.

Mashable Light Speed

SEE ALSO:

Webb telescope smashed a record with the planet it just discovered

A single BOLE booster produces more than 4 million pounds of thrust.
Credit: Northrop Grumman

The BOLE motor is a major redesign of the ones used on NASA’s Space Launch System, or SLS, the rocket built to carry astronauts to the moon under the Artemis program. It swaps out old parts with lightweight materials and new fuel, giving it more thrust and allowing the rocket to haul heavier loads.

The boosters for the first eight flights of Artemis repurpose the steel booster cases and other parts from the Space Shuttle program. Beginning with Artemis IX, the SLS rocket, sometimes dubbed the mega moon rocket, is supposed to use the BOLE. The plan is for two of them to flank either side of the rocket.

“In order to save cost and schedule, we implemented the Shuttle’s proven heritage hardware into our design, but this is being depleted as the Artemis program progresses,” said Julia Khodabandeh, NASA’s deputy manager for the SLS booster element office. “It’s just not practical to restart the manufacturing from that 1970s era.”

This was the first demonstration test of the enhanced five-segment solid rocket motor. That single booster produced more than 4 million pounds of thrust, said Dave Reynolds, NASA’s SLS booster subsystems manager.

“You can see from the side of the mountain up there,” Reynolds said afterward, “it’s still feeling the effects of that test.” 

The purpose of the demonstration was to test the limits of the motor’s design, understand the stress and strain on different materials, and see if the motor’s components could withstand extreme conditions. The two-minute test mimics the time a booster would fire during a real launch. Northrop Grumman officials said the data from the BOLE test will help improve the design. 

The new boosters are not expected to fly until at least the late 2030s, and it’s unclear whether they ever will. Proposed budget cuts for NASA would mean SLS production ceases after Artemis III, the first human moon landing since Apollo 17. That mission has been postponed until 2027 at the earliest.

The White House has said it would like to see the space agency focus instead on using commercial systems. Lawmakers are still debating how many more SLS launches, about $4.1 billion each, to fund.

Next Post

Facebook is asking users to use Meta AI on the photos in their private camera roll

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • Moon phase today explained: What the Moon will look like on March 24, 2026
  • BT boosts connectivity, security for Northern Ireland Electricity Networks
  • Monster Hunter Stories 3: All Invasive Monsters Locations
  • Traefik becomes the de facto standard for Kubernetes Networking
  • Nothing Phone 4a Pro has a fresh design, and survey shows you love it

Recent Comments

    No Result
    View All Result

    Categories

    • Android
    • Cars
    • Gadgets
    • Gaming
    • Internet
    • Mobile
    • Sci-Fi
    • Home
    • Shop
    • Privacy Policy
    • Terms and Conditions

    © CC Startup, Powered by Creative Collaboration. © 2020 Creative Collaboration, LLC. All Rights Reserved.

    No Result
    View All Result
    • Home
    • Blog
    • Android
    • Cars
    • Gadgets
    • Gaming
    • Internet
    • Mobile
    • Sci-Fi

    © CC Startup, Powered by Creative Collaboration. © 2020 Creative Collaboration, LLC. All Rights Reserved.

    Get more stuff like this
    in your inbox

    Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

    Thank you for subscribing.

    Something went wrong.

    We respect your privacy and take protecting it seriously